Nia Okonkwo Studio
Built-in oak library wall with floor-to-ceiling shelving, a rolling brass ladder and a leather reading chair
Archive

Humboldt Park Library and Reading Room

A 1,400-volume perimeter library in quarter-sawn white oak, with radiator airflow routed through the casework and brass hardware made for the job.

Location
Humboldt Park, Chicago, IL
Client
Private residence and collector
Scope
Shelving, base cabinets, rolling ladder
Timber and finish
White oak, soap wash
Install
Four days on site
Shelf capacity
1,420 linear feet
Hardware
Unlacquered solid brass
The brief

What the room asked for.

The room had to hold 1,400 rare volumes in a 1912 parlor with original horsehair plaster and a cast-iron steam radiator sitting in the south window bay.

Plaster walls well out of plumb

Measured on site, the north wall ran 1.85 inches out of plumb over a 12-foot height. Pre-built millwork would have left gaps, or needed quarter-round trim to hide them.

Radiator heat with nowhere to go

Boxing in the radiator without a way out would have warped solid shelves and baked antique spines. The airflow had to work without visible plastic louvers.

A 29-inch door at the top of a dogleg stair

Every vertical upright ran past 10 feet, and the parlor could only be reached through a narrow stairwell turn.

Engineering

Drawn before anything was cut.

Every component was drawn in joinery cross-section before anything was cut, so the parts met on site the way they met on paper.

Slatted oak convection grille recessed into the base cabinet, a brass reveal running above it
Radiator convection plenum A concealed chimney carries the radiator heat out through a brass shadow-line reveal, so the shelves above it stay cool.
White oak pilaster scribed tight against an uneven plaster wall, with books on the shelf above
Scribed pilaster Side panels contoured to the wall, so the oak meets the old plaster without a trim strip covering the gap.
Outcome

How it went.

Because the joinery and the scribe geometry were settled before anything was cut, the 22-foot run went in over four working days with two people. No table saw on site, so no dust on finished floors.

Keep looking

The rest of the archive.

All works Inquire for your space